Everyone should work hard after buying the ready mix plant , which is related to your own safety and responsibility.
Points for Attention in concrete mixing plant work:
1. When the concrete mixing plant is repaired, the power must be cut off. It is strictly forbidden to turn on the main switch during the repairing period. The operator carries the key of the main switch.
2. If the ready mix concrete plant needs to dismantle part of the installation device during the overhaul, these components must be re-installed after the overhaul.
3. The electrical part of ready mixed concrete mixing plant must be repaired regularly. If damaged, such as loosening or burning, it must be repaired immediately.
4. When welding the fuselage of ready mix plant , if it is wet, leakage should be prevented.
5. Concrete mixer should not shut down the mixer in the process of concrete plant. If an accident occurs in the process of mixing, the unloading door should be opened to unload concrete to prevent concrete from solidifying.